By the Numbers 2026

Chapter 7: Financial & Physical Resources

Data in this chapter are presented by fiscal year, May 1, 2025 to April 30, 2026.

On this page

    Facts & Figures

    $276.4M
    Total revenue, 2025–2026

    75,095
    Square metres of space allocated to U of T Engineering

    21
    Buildings partly or wholly occupied by U of T Engineering, from the historic Sandford Fleming Building to the innovative Myhal Centre

    Figure 7.1 Total Revenue, 2016–2017 to 2025–2026

    Figure 7.2 Total Central Costs, 2016–2017 to 2025–2026

    Figure 7.3 Budget Data, 2016–2017 to 2025–2026

    2016–172017–182018–192019–202020–212021–222022–232023–242024–252025–26
    Unrestricted Revenue
    (net of UF Contribution)
    $178,459,435$184,836,509$189,960,978$185,052,620$193,218,344$202,902,197$214,788,927$221,185,538$234,582,189$240,105,707
    Restricted Revenue$24,525,299$28,686,839$28,225,383$29,712,446$31,332,611$33,091,968$32,322,686$33,950,089$34,084,504$36,265,059
    Total Revenue$202,984,733$213,523,348$218,186,361$214,765,067$224,550,955$235,994,165$247,111,613$255,135,627$268,666,693$276,370,766
    Divisional Recovery for Interdivisional Teaching$5,084,764$5,028,443$11,067,206$10,910,265$8,720,807$8,828,754$9,359,026$8,853,055$8,728,987$8,810,206
    University-Wide Costs$65,553,462$70,384,637$75,233,388$75,822,728$82,258,808$86,055,838$88,475,306$89,921,354$94,139,794$96,982,598
    Student Aid Levy$13,793,571$14,716,594$15,542,692$15,703,617$17,749,925$19,562,608$21,732,620$24,582,795$25,212,771$25,730,127
    Total Central Costs$79,347,033$85,101,231$90,776,080$91,526,344$100,008,733$105,618,445$110,207,926$114,504,149$119,352,565$122,712,725
    Net Revenue$118,552,936$123,393,674$116,343,075$112,328,457$115,821,415$121,546,966$127,544,661$131,778,423$140,585,141$144,847,835

    Figure 7.4 Revenue Sources, 2025–2026

    Figure 7.5 Revenue Distribution, 2025–2026

    Figure 7.6 Total Operating Budget: Breakdown by Expenses (Net of Central University Costs), 2025–2026

    Figure 7.7 Summary of Buildings Occupied by Engineering, 2025–2026

    Values represent square metres occupied by each department.

    CodeBuildingOffice
    of the
    Dean
    EngSciChemECivE
    & MinE
    ECEIBMEISTEPMIEMSEUTIASTotal NASMs
    ASAerospace (Downsview)5,2895,289
    BABahen Centre1,6285815,5281,6659,402
    DCDonnelly CCBR6678891,556
    ESEarth Sciences164164
    EAEngineering Annex241924911,256
    ELElectrometal149149
    FIFields Institute332332
    GBGalbraith1,5055,3124,3185411,189
    HAHaultain351981107277211,790
    M2MaRS West Tower1367911831,110
    MBLassonde Mining1,1381,3621,8908325,222
    MCMechanical Engineering635,3845,447
    MYMyhal Centre5,2085645,772
    PTD.L. Pratt1,3131,4882,801
    RSRosebrugh9842,1963,181
    SFSandford Fleming6291,5593,5461376926,563
    WBWallberg3408,2961301,38110,147
    800800 Bay1,4541,3282,781
    BY255 Beverley375375
    ZC88 College8282
    RM256 McCaul528528
    Total Area12,4195819,3248,11815,8954,02675513,3744,6625,98175,136

    Figure 7.8 Selected Infrastructure Investments, 2025–2026

    ProjectDescriptionProgress
    Lawson Climate Institute’s Grid Modernization Centre (GMC)Sponsored and hosted by the Edward S. Rogers Sr. Department of Electrical & Computer Engineering (ECE), this will be Canada's inaugural laboratory dedicated solely to the advancement and integration of renewable energy technologies into the national power grid. The Lawson Climate Institute (formerly the Climate Positive Energy Research Initiative) is an Institutional Strategic Initiative (ISI) that brings together 50 partners from across the energy eco-system.

    The GMC will accommodate a Power Hardware-in-the-Loop (PHIL) setup, combining real-time digital simulation and physical hardware testing. 
    An initial feasibility study for a proposed off-Campus location for the GMC was completed in December 2024 and concluded that it was not feasible to accommodate it there. A follow-on feasibility study then looked at accommodating the GMC on the St. George Campus, in the basement of the Galbraith Building. It was concluded that the GMC would be feasible there.

    The architectural & engineering design of the GMC was undertaken by ENFORM Architects Inc., in late 2025 and early 2026. The construction documents were tendered in April/May 2026 and a contract was awarded at the end of May. It’s expected that the GMC will be ready for takeover by the end of 2026, with all of the research equipment installed by April 2027.
    Platform for Advanced Structural MaterialsThe Extreme Conditions Testing Lab for Ultra-high Performance Structural Materials will support the work of Professor Yu Zou (MSE) on metals, mechanics, manufacturing and machine learning.

    Professor Yu Zou’s CFI Innovation Fund 2023 award, An Integrated Platform for Testing Ultra-high Performance Structural Materials in Extreme Conditions, enabled this project to proceed.
    Procurement of the architecture & engineering design team (AMRA J Architects) was completed on February 18, 2025.

    The design team has substantively completed their design and specifications and is now considering the ability to include for the late addition of research equipment before the finalized scope of work can be tendered.

    Following tender and the award of a contract, it’s expected that the lab would be ready for takeover by February 2027.
    Adjustable Multi-dimensional (AMD) Loading System & Upgrade of Structural Testing Facilities in the Galbraith BuildingThe revitalization of the Department of Civil & Mineral Engineering’s Structural Testing Facility in the Galbraith Building is part of a proposed long-term research project to establish a mega-scale Adjustable Multi-dimensional (AMD) experimental loading facility. The project is funded by a Canada Foundation for Innovation (CFI) Innovation Fund 2020 grant and by the Dean’s Strategic Fund.The first phase of this project, the demolition of the old strong floor and the placement of reinforcing steel, steel plates, and the concrete pour & grinding of the new strong floor to achieve the specified flatness and levelness profile values, is complete.

    The second phase of this project, the fabrication and installation of the AMD loading module, is underway. The hydraulic system and data acquisition systems are being upgraded to support the AMD. The AMD components are being fabricated and shipped to the Structural Testing Facility for assembly onsite, with the first heavy delivery expected in June. Project completion is expected in September 2026.
    MIE & ECE Myhal Centre Printed Circuit Board (PCB) Prototyping & Fabrication FacilityThis project involved the design and construction of a PCB prototyping & fabrication space, required by two of the Faculty’s academic departments (MIE & ECE). Funded by the Dean’s Strategic Fund, along with MIE & ECE funding; it is located on Level 400 of the Myhal Centre, adjacent to the Faculty’s Fabrication Facility that will operate & maintain the lab.

    It offers prototyping support for various design-project courses, using equipment such as pick-and-place automated & manual machines, rework stations, an air compressor, microscopes, and elevated lab tables.
    The construction of the lab is complete, enabling it to be scheduled throughout the 2025–26 academic year for courses such as ECE295, ECE496, MIE346 and MIE366.
    Sanford Fleming Basement Atrium RenewalA successful 2021 Student Spaces Enhancement Fund (SSEF) award enabled University Planning, Design & Construction to take on this project, jointly managed by U of T Engineering and student Engineering Society (EngSoc) project to renovate the basement area of Sandford Fleming.

    The renovation includes the surrounding food court seating, corridors, washrooms and the activity space commonly referred to as ‘The Pit.’ Many of these functional features will be made accessible as set-out in the University’s Facility Accessibility Design Standard.
    With the design completed and full funding secured, the work was tendered and awarded in early summer 2025.

    Following temporary relocations, demolition commenced in August 2025, with the finished spaces still expected to be substantially complete for September 2026.
    The Dean’s CO-llaborative Multidisciplinary Enabling Transformation (COMET) Program of Projects: Infrastructure for Experiential LearningLaunched March 2025, the $44M COMET funding program supports innovative projects that modernize experiential labs, initially intended to be across four departments: CivMin, ChemE, MIE and ECE.

    The projects will include engineering labs to be equipped with cutting-edge technology and collaborative workspaces, fostering an environment of innovation and excellence.

    The Faculty is providing matching funds dollar-for-dollar, to those funds from an academic unit(s), advancement funds or partnership funds up to a maximum total project cost estimate of $5M. Selected projects above the $5M threshold require the additional funding to be secured from other sources.
    From nine submissions, five project proposals were identified for further phased development. From those five, two were selected for immediate development:

    1. The Sustainable Teaching Factory COMET Lab (MC215/216), sponsored and hosted by MIE. Estimated budget $10.9M.
    2. The Sustainable Unit Operations COMET Lab (WB25/125), sponsored and hosted by ChemE. Estimated budget $20.4M.
    Over the past year, the focus of the program director, the proposal proponents and their sponsoring departments has been on how to expand these two proposals to be broader in reach, including potentially providing access for other departments and divisions, along with developing cases for support from alumni and corporate partners.
    Open Centre for the Characterization of Advanced Materials (OCCAM) Transformative Expansion – Elevating OCCAM to Global Prominence in Materials CharacterizationThis CFI Innovation Fund 2025 project has been awarded, with both CFI & ORF funding. Presently, the need is to accommodate the installation of a new hybrid secondary ion mass spectrometry (SIMS) system, a near-ambient pressure x-ray photoelectron spectroscopy (NAP-XPS) system, a high-throughput XPS system, a Brunauer, Emmett, and Teller (BET) system, high-purity glovebox, and a profilometer.

    Additionally, the scope of work requires the modification of HVAC and electrical services to suit.
    A Request for Project Services submittal by ChemE, the project sponsor, to the central University Planning, Design & Construction Facilities & Services teams is the next step.

    The CFI-IF program requires construction to start by May 2027, within 18 months of the funding decision. It’s expected that the facilities will be ready for takeover by the end of 2028.
    City of Toronto Traffic Operations Centre (TOC) & Innovative Mobility Lab (IMIL)Sponsored and hosted by the Department of Civil & Mineral Engineering, the City of Toronto would like to establish a Traffic Operations Centre (TOC) at U of T, to be housed in CivMin’s Intelligent Transportation Systems (ITS) Centre lab (SF3102/3103).

    The City of Toronto currently operates the RESCU Traffic Management Centre which is responsible for managing traffic & traffic lights throughout the city and needs a secondary location to expand its management functions and possibly act as a backup operations centre. They will also renovate adjacent space in that suite (currently housing CivMin grad students) into a state-of-the-art research facility with access to the City’s traffic data feed.

    This research space (the City proposes to call it the Innovative Mobility Lab (IMIL)) will be led by an academic Director, with students working alongside City staff and attracting funding for research, leveraging MITACS, supporting the EngSci Major and connecting to CARTE.
    The terms & conditions of a license agreement, including capital and operating considerations for the City to be accommodated on U of T property along with IT infrastructure responsibilities, are currently being negotiated by the Parties.

    UPDC’s Design & Engineering unit is standing by to provide design services for the fit-outs that will be needed.

    Figure 7.9 The Engineering Neighbourhood

    • BA – Bahen Centre
    • BY – 255 Beverley Street
    • DC – Donelly CCBR
    • ES – Earth Sciences
    • EA – Engineering Annex
    • EL – Electrometallurgy Lab
    • FI – Fields Institute
    • GB – Galbraith Building
    • HA – Haultain Building
    • M2 – MaRS West Tower
    • MB – Lassonde Mining Building
    • MC – Mechanical Engineering Building
    • MY – Myhal Centre
    • PT – D. L. Pratt Building
    • RM – 256 McCaul Street
    • RS – Rosebrugh Building
    • SF – Sandford Fleming Building
    • WB – Wallberg Building
    • UTIAS – University of Toronto Institute for Aerospace Studies
    • ZC – 88 College Street
    • 800 – 800 Bay Street
    Map of UTIAS building location at Downsview.
    Map of Engineering Buildings on the St. George campus.